Sunday, April 18, 2010
Weekend Scones Report: Breakfast In... the Laundry Room?
Saturday, April 3, 2010
Planting, Framing, Painting, Framing (A Different Kind), Wiring, Writing (Or: Where Has My Weekend Gone?)
The framing? I needed mats cut for two 12 x 18" prints, so I picked up a Logan 450 Mat Cutter at AC Moore with a 50% off coupon (making it cheaper than Amazon by about $40, but it can be found more cheaply online than that). I framed the two photos (one of Fort De Soto Beach at sunset, one of a park in Vicenza, Italy), then moved on to more complicated matting and framed a creepy kitty postcard from Venice (said feline is dressed as a plague "doctor"), doing the 4 x 5.75" postcard in a huge 12 x 16" frame with a black mat.
Painting... well, not as much as I might have wanted so far, but I got out the power paint stirrer for my drill and cracked open a can of the chocolate we used in our hallway... two coats later, and the new thermostat looks like it was always meant to be there--despite all the screw holes I filled and sanded down where the new unit hangs vertically. Add some general touch-up in the hall as well... I'll say the paint, over a year old now, is on its last legs; within 10 minutes after mixing, it had already begin to separate back out. That leaves the library wall near the lights witch, as well as the library closet (which is still fuchsia, believe it or not). And touch-up here and there throughout the rest of the house. Not to mention the Neptune Suite and painting the exterior block walls, but those latter tasks will have to wait.
Framing again... I'm slowly working on framing in the new wall and doorway which will separate the laundry & storage room from the rest of the basement--once complete, guests staying in the Neptune suite need no longer see our Zombie Preparedness Racks of food bought in bulk and the like, or our grubby laundry sink and the sundry junk (X-mas decorations?) piled around that room.
Wiring... goes with that latter framing. Two new outlets (one GFCI), a new light fixture, two light switches, and rewiring two fixtures we put in a few weeks ago to get them all on the same breaker. Still to come: crawling in the attic again before it gets ungodly hot and draws in all the buzzy-bees and creepy-crawlies who have come to life with the coming of Spring. I've got a ceiling fan and the Library's second fixture to install before weather compromises my ability to work in the attic.
Writing... well, I keep having inspiration to go and put some pen to paper and tackle something really creative--maybe the Torso Man story, or maybe something a little less gruesome. Instead, I'm pooped and am writing in my blog.
I've left out photos, something quite important, as the Bird Watchers' Digest contributor submissions are due Monday, so I've got tomorrow to get my set together and posted online for BWD with the hopes of having them take (and pay me for) one of this month's. And I've got to check into the due dates for Virginia Wildlife's contest, and Wild Bird's (which I won last year with my White Ibis--can't enter the amateur category there anymore; sigh). Not to mention more trip photos to process, bird photos taken around the yard (no time yet for a trip to our favorite birding park, Huntley Meadows; sigh).
And cooking... oh, yes, how can I forget that? I think I'll have to devote another blog to that alone.
It's been a busy start to the weekend, anyway.
Friday, November 13, 2009
Celebrating One Year at Chateau Papillon

This post is a couple of days late, but we celebrated one year as happy homeowners at Chateau Papillon on Tuesday. We closed last November 10th and thus began the first phase of of what we hope to be many years of making the home our own, from the travails of taking out glued-down carpet and installing a slightly too-wide gas range to installing bamboo floors
Saturday, August 15, 2009
Renovating an Antique, Part I: Reupholstering a Chair for the Library
Several years ago, my aunt Mae had taken the sitting room furniture off when my aunt Marian wanted to redo the room; Aunt Mae never got around to having the chair and couch reupholstered, though, and recently, she offered them to Beth and me. As the wood itself was in great shape (particularly given the furniture is at least 100 years old), we decided to do the upholstery ourselves. Above, you can see the "before" shot, with Mr. Parker, enjoying the ratty old fabric. Aunt Mae must have tossed the cushions at some point (probably just as well, given the state of the fabric underneath).
After a lengthy, hot afternoon pulling out dozens of upholstery tacks, Beth and I finally got all the old fabric off, and the springs removed. To make things simpler, I used the table saw to cut a base platform to replace the springs; above, you can see that Didi quite approves of the chair which will soon be added to our library.
A couple of years ago, I repaired one of our antique kitchen chairs after its seat broke; in the process, I removed the old cushioning and replaced it with memory foam, making it the envy of the dining room table. Taking similar inspiration for the antique claw-armed chair, Beth and I cut a block of 3" thick standard foam, topped with an inch of memory foam padding from an old bed pillow top we'd quit using; a bit of foam glue pieced the layers together nicely.Sunday, July 26, 2009
Corner Shelves for the Library, Finally
For most of the spring and early summer, we've been working outside at Chateau Papillon, putting together our gardens (both natural and vegetable), but the oppressive heat of the past few days--coupled with the work I got done inside while Beth was out of town, such as redoing the pantry shelves and installing some of the baseboards and trim--gave us the impetus to move the library one step closer to completion.The shelves were a tricky design; they're irregular hexagons, with a back edge (against the corner support) about 7 inches wide, a front edge of around 14 inches, and then two sets of sides (one set parallel to the shelves, one set parallel to the walls) of something like 11 and 16 inches, respectively.

Saturday, April 4, 2009
Do-It-Yourself to Save
Tuesday, March 17, 2009
Moving the Renovations from Inside to Outside
Now, landscaping and gardening take mucho dinero, and recall that Beth was laid off (and is still job hunting, though she's also working on developing a petsitting business as backup). That does limit some of what we can do, but given both our desires to "do it yourself" to begin with, our expenses are thus limited to materials.Friday, February 13, 2009
The Library Is Almost Done!

A quick review of recent posts in the "renovation" category will show a lot of progress on our library at Chateau Papillon; from the first two shelving units to the extension to the second wall, I've covered a lot of our work to-date on adding that most critical of rooms to our home: the library. I've been remiss of late, though, in posting what we've accomplished in nearly completing said home for books.
Sunday, February 8, 2009
Doing Our Part to Stay Green
Even better, I've recently been able to replace several bulbs with LEDs, which consume even less electricity (and don't have any issues with mercury, either). The dining room chandelier had used five 40-watt incandescents, and the candelabra-base CFLs simply didn't fit inside the light sconces--but Sam's Club just started carrying LED candelabra bulbs which consume only 1.5 watts of power for their 40-watt equivalent light output. These bulbs fit the fixture and are priced right ($5 apiece); price has been one of the big detractors to wider-scale LED bulb use to date--for example, one basement spotlight fixture took three 1.5 watt LEDs to replace three 50-watt halogens, but at a cost of $30/bulb. Eek! The only downside is that these LED bulbs from Sam's are very directional (this is a problem with most LED bulbs today, mind you); the majority of their light is emitted straight out the end of the bulb. I'm not sure why the array of individual LEDs are set up all in the same direction or why the protective plastic casing doesn't have a series of refractive lenses to disperse the light better... but for the chandelier, which primarily lights downward onto the dining room table, they work just fine.
Tuesday, January 20, 2009
More Shelves, More Books ... Continued Library Work


Forgive the wide angle distortion in the above photo; however, it should give an idea of how the library's really coming along. I've unpacked another four to five cartons of books--only somewhere north of 15 left (eek!), with many of those oddly-sized books which will shelve much less neatly. Still, we've got the corner units to build, another slender unit to the left of the window framing, and two units up to the window on the third wall--and perhaps that window will be framed in, too. The latter will necessitate more lumber, though; I'm down to two full sheets of plywood and cut sheets for another two standards and several shelves.Saturday, January 17, 2009
The Library Begins to Take Shape

Though there's woodwork still to be done--puttying and sanding the nail and screw holes for the standards as well as the shelves (which are stabilized by a thin strip glued and nailed to their front edges) for one, then attaching decorative molding to the fronts of the standards and along the ceiling, and of course painting or staining the shelf units, too. But I really wanted to get a sense of how they'd look and work with books on them, so after Beth and I got the last standard in place for the wall (the one to the far left), I worked on setting the shelves in place and unpacking.
Sunday, January 11, 2009
More Progress on the Library (And No Thanks to You, Mother Nature!)

First, we ripped several sheets of quality plywood into strips 11.5" wide and just under 8' tall; these would, with 1x4" boards sandwiched in-between, form the uprights for the shelf units. In the photo above, you can see one of the uprights in nearly-finished form: the two sheets of plywood have been glued to the 1x4" boards (and then screwed together for good measure). I've clamped in-place a piece of pegboard which I used as a guide to drill the holes for adjustable shelves; subsequently, using a drill bit with a "stop" bolted on to control its depth, will drill the two rows of holes, over 300 per upright in total.

After that, I screwed lag bolts into the bottoms of the uprights, then sawed off the bolt heads using a hacksaw. These pegs nee bolts then fit into holes drilled into the floor, and after much work with a level to ensure the upright is plumb, it got bolted to the wall as well.
Wednesday, January 7, 2009
Picture Rail for the Home Gallery
Sunday, January 4, 2009
Progress on the Library

Finally, today I got to work on reflooring the library. Like the master bedroom and my home office, there had been a lot of damage to the original hardwood floors: paint spills by a former owner or tenant, and many staple and nail holes from the carpet which had been there under the prior owner's tenure. No problem; we'd ordered enough bamboo to cover all three of those rooms. I just hadn't had time yet to tackle the library.

The floors are (almost) done now; I've only a few specially-cut strips along the entry side of the room to install. See those stacks of boxes in the background? Those are our books, aside from a couple of cartons at the very top. Between these boxes and a few of cookbooks in the basement, all told there are just under 40 cartons of books awaiting their shelves!
Monday, December 29, 2008
A Very Hokie Home Office
As you can see in the photo above, there's little doubt where I went to college. I chose to paint the office walls in Home Depot's Collegiate Collection "VT Maroon" for an authentic look (more on that in the earlier blog entry, "Mothers, Don't Let Your Daughters Grow Up to Be Princesses"), and Linens 'N Things' going-out-of-business sale offered up these two orange curtains. That VT football field rug came from Kohl's, I believe, via my parents. The VT football endtable is a gift from my aunt Marian, like the Tiffany lamp.
Of course, my two diplomas were among the first things to be hung on the wall. I'd really like to add another or two (I do need to finish my M.A. in English; a M.S. in Computer Science or a M.F.A. in Creative Writing would be nice, too)--but I'd have to move things around a bit to make space!
This disturbing Salad Fingers wall plaque (crafted by my sister and her husband, and hanging in my office only because Beth wouldn't have it out "in public" near the front door where I'd wanted to put it) holds several pieces of Virginia Tech "flair," including bowl game ticket stubs for two Sugar Bowls (including the national championship game for '99-'00), a Gator Bowl, and various Hokie-themed bead strands collected in New Orleans.
My office is a bit of a "Where's Waldo" exercise in picking out all the Hokie-themed memorabilia. This shot of the side wall shows a Tiffany VT lamp my aunt gave me a few years ago, along with my custom-made VT shoes (from the now-defunct Customatix), a Hokie bird beanie baby, a photo of Hokies Matt, John, and Zina from the '06 UNC game, and--if you look really closely--the "Dr. Who" Hokie scarf Beth crocheted for me several years ago (yes, it's approximately thirteen feet of orange and maroon warmth). As the library isn't finished yet, I've got many of my birding references as well as some of my signed and vintage hardbacks and favorite paperbacks set up in the office bookshelves for now.Aunt Marian has given me several VT football-themed plates as well; I don't yet have a place set aside to hang them, though once the library is set up, I may put them atop my office bookcases.
Friday, December 12, 2008
The Trials of Glued-down Carpet
... until we discovered the basement carpet had been glued down instead of stretched and tacked as was done in the bedrooms. While not unusual for installations over concrete or tile, the carpet glue made our renovations quite painful. I initially tried pulling up the whole carpet, but quickly discovered how sticky the glue was and gave up on salvaging the carpet. At that point, I had two options: cut the carpet into strips (which individually would be easier to remove), or apply some solvent to help dissolve the glue. Given we were trying to avoid fumes--recall we chose low-VOC paints for the basement--and the furnace and water heater would have to be turned off to prevent a possible explosion from the flammable solvent vapors, you can guess which option we chose.
Chance decided he'd "help" as he so often does: by climbing atop (or, as in the photo above, into!) the carpet as we were removing it. Crazy Chance!
We had to remove the carpet in stages; between cutting the strips (itself a difficult task which wore out my hands and several utility knife blades), pulling them up, and using an industrial-strength floor scraper to help pry up the carpet and padding and remove any particularly-stubborn patches of glue, it was back-breaking work. As a reward to ourselves (and a break from the carpet removal!), we started on the installation of the new floor before we'd even finished taking up the carpet.

We're almost done with the basement flooring; above, you can see the last bits of exposed vapor barrier along with a bit of the OSB subfloor. We've finished now up to the last strip, a 3" or so border down the edge of the wall; once that's done and I fill in some gaps along the base of the wall with foam sealant to keep out bugs and moisture, it will be time to put in the new baseboard.
Thursday, December 4, 2008
Mothers, Don't Let Your Daughters Grow Up to Be Princesses

A consultation with the paint desk at Lowe's on how best to prime the walls and ceiling for repainting led to some "Maximum Color Hiding" primer plus a can of flat white ceiling paint; Home Depot provided the wall paints in a Virginia Tech maroon and a grey primer to go beneath it.
Let me tell you: priming walls is no fun at all. I put an entire gallon of that "maximum hiding" primer onto the small room's walls (my office is approximately 10' x 10') in two full coats and some additional touch-up, and you could STILL see the fuchsia shining through. Likewise, the ceiling was even less pleasant and took two coats of primer as well, leaving a hint of lavender showing, too.

The ceiling then took two more coats (four total!), this time of flat white ceiling paint. I think I removed all traces of purple, but it's tough to be sure. At any rate, nearly two gallons of white paint later, and the room was ready to get its new colors. Beth painted a coat of grey base to go beneath the Hokie maroon (recommended by Home Depot to help the maroon show up properly), then I followed that up with two full coats and some spot work in maroon paint.

Though the above photo shows the maroon paint in various stages of drying--and thus appearing fairly streaky and purple to boot--the end result does look good, and once I have the baseboard in place and the furniture arranged, I'll post a photo of the finished product. After painting, I put down a layer of bamboo flooring (full tongue-and-groove boards--no laminates!) and have cut, but not fully installed, baseboard; shoe moulding is going to be one more required touch to fully conceal the floor's edges. And, of course, I hung orange curtains...
Tuesday, December 2, 2008
Lost Chapters in the Saga of the Gas Range
My grandmother's house had one of those vents next to its range, too, if that gives you a better idea as to the age of the fixture--and from the amount of grime on the vent fan itself, this one could have certainly been an original to the house circa 1964.
First, I had to pry off the faceplate; I then was able to unplug the fan itself and pull it from the duct. I considered routing the range hood's vent out the same hole (the hood currently vents into the kitchen--less than ideal--but direct venting the hood outside would require knocking another hole in the exterior wall), but the ductwork necessary was going to be problematic (two tight 90-degree elbows which would likely become grease and gunk traps).
So, I cut a piece of cardboard to the size of the existing duct and caulked it into place, blocking off the end of the duct from further drafts. After that, I filled the rest of the duct with fiberglass insulation, caulked around any gaps, and put a heat shield in place to cover the now-filled hole through the wall (no need to redo the drywall when it's behind a piece of metal!)
As for those new discoveries? Well, don't order a gas range online. I've read and re-read the specs as presented on the Sam's Club Web site, and nowhere does it say that the range is 31" wide at its widest point (the failing which led to my having to notch the wall); to be fair, GE's own specs don't list the 31" dimension, either, unless you dig pretty deeply. But also nowhere on the site does it say the range has a broiler drawer and not a standard waist-high broiler! In effect, there's only the lower gas burner in the oven, with none at the top, and the drawer underneath the oven holds a broiler rack. Problem is, large things (like turkeys) cannot be broiled in the drawer--only stuff like toast, steaks, and fish fillets, and broiling involves bending over to floor-level; any decent chef knows the mise en place for a good kitchen minimizes awkward movements and actions for tasks done frequently (like broiling).
I'll have to live with the limitations of a broiler drawer for now, because I'm not about to buy another new range (nor can I afford one at present). I think I could have spent $100 more and gotten a range better meeting my expectations--problem was, the Web site presented it as having a smaller oven (probably so--to account for the additional waist-high broilers). I guess when we tackle some major kitchen renovations--such as expanding the kitchen itself when we build a sunroom for the birds and extend the kitchen over it (and add a sunny little breakfast nook), we'll replace with a couple of in-wall ovens and a cooktop on an island; 'til then, we're stuck with this range.
I tried doing a lot of Web research in picking out the right model for our budget and feature requirements, but never could find the exact model numbers anywhere to make sure everything lined up (and, to be fair, GE has several dozen models nearly identical and within a few hundred of each other in price, making things even more difficult). Shame on me for not doing more research, and shame on Sam's Club for such poor description of their items on their Web site.
Sunday, November 30, 2008
The Saga of the New Gas Range
First things first: we got estimates and hired plumbers to come out and run a gas line to the kitchen; the existing gas line entered on the opposite end of the house, where it fed the furnace and water heater. At least the drop ceiling in half the basement made it relatively simple to route the extension line, though it still involved multiple visits from the plumber, a Washington Gas subcontractor to re-do the meter and regulators, and the Fairfax County gas inspector.
Of course, I had to run a new electric line for the gas range, too. The electric range had a 220 volt range outlet in place; the gas range needed only basic 120 volt line service. The home's breaker box was full, of course, but removing the big 50-amp, double-pole breaker for the old range gave me plenty of room to add a 15-amp circuit for the new gas appliance. (Fortunately, I've worked informally as an electrician before, spending summers in high school working for my uncle's construction business--that saved us quite an expense!)
The biggest problem, though, became the range itself. The existing electric range abutted a wall--and bubbled paint testified to the poor choice of location that had been; our home inspector recommended a heat shield for safety (and with a gas range's high heat output, a doubly-necessary precaution!) So I put on order a metal plate that would cover the wall next to the range and thought no more of it--and after some measurements, ordered the gas range itself.
I'd ordered a fairly basic GE gas range, one with a "power" burner and another "precise simmer" burner but little else fancy (we'd after all just spent several hundred thousand dollars on the home plus thousands more in our initial renovations). Its dimensional specifications matched the electric range we'd be replacing, so once the gas line was in place, we'd be set, right?
Wrong.
What GE didn't mention in their specs was that the range's console was actually 31 inches wide, even though the oven and range top were but the specified 30 inches. In the recommended installation with at least two inches of space on either side of the range (remember the need for a heat shield due to the wall being so close?), that extra inch wouldn't be a problem... but in our tight quarters, it became a show-stopper. The only viable solution was to cut into the wall itself!

I planned to cut out the drywall alongside the range, replacing it with the metal heat shield I'd ordered. That would buy me at least a half an inch, which would not only let me get the range into place but would also be better from a safety standpoint as well, moving the wall surface back just that little bit more from the range.
As you can see in the photo above, I first cut (using a utility knife) the outline of the new heat shield, then used a drywall saw to slice away the wall itself. I even got a hammer involved--I realized once I'd cut the outline, there was no reason to wear myself out sawing through the drywall when I could just break it up into chunks and trim away the last bit of paper backing.
That got the space opened up; I then had to add some framing to support the new heat shield. Initially, I ran full 2x4's between the existing wall studs, but then I realized I only needed to put anchor blocks at the corners (notice the one to the upper left--necessitated by the routing of the light switch wires), which I attached via drywall screws to the remaining drywall. I then ran some J-bead along the exposed edges of the drywall, applied several coats of drywall compound, and sanded them flush to the wall.
The finishing touches included another coat of grey primer and two coats of VT Maroon paint; the heat shield then screwed to the supports I'd added, followed by a trim layer of shoe moulding mitered to sit inside the opening and reinforce the J-bead edges.
The range was still a tight fit, but not because of the console any longer. My work notching the wall and putting in place the heat shielding took care of that perfectly. A second heat shield went in behind the range; I will probably frame it in shoe moulding later to make it consistent with the side wall (and yes, we do plan to replace the microwave with a black unit to match the range later as well).
What a saga! Well, what's life without a bit of spice to it?





