Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts

Saturday, June 4, 2011

Weekend DIY at Chateau Papillon: Toilet Replacement

Channel-lock pliers. Bolt cutters. Hacksaw. Brake cleaner. WD-40. 9/16 box end wrench. Chisel. Screwdriver. Socket wrench. Hammer. Putty knife. These are some of the tools needed to remove the old toilet in my bathroom at Chateau Papillon, thanks to the heavily-rusted flange bolts holding it to the floor. After all that, I wonder if a sledgehammer might not have done the job of all of them together and with more satisfying fun to boot.

Replacing a toilet isn't really that hard of a job--I've tackled far more challenging DIY projects at Chateau Papillon in the past.  Still, like so many home improvement jobs, it ended up taking a lot longer than I'd expected; I had figured on about an hour total to remove the old toilet and install the new one, and it took closer to three.

Why the new toilet?  It was an "impulse buy" at Costco, I have to admit.  Beth and I had gone specifically to check out a laundry sink--something I spied at a Costco in Richmond last summer but which until now our local one had never had in stock--and right next to the sink were several high-efficiency, dual-flush toilets for under $90.  That's a pretty good buy; I'd looked at similar units at Lowe's and Home Depot before, typically for upwards of $150 with several brand-name models over $280.  Couple with that the fact we'd just gotten back from Spain, where like so much of Europe the toilets are similar to the one in the store, and we were sold.

Not to mention that my bathroom's old toilet was wearing out--I'd had to replace several parts on it over the past couple of years.  Nor that it was a water-hog, slurping down around 5 gallons per flush.  I don't think it dated back to the original home construction (mid-'60s), but the toilet wasn't much newer than that, either.

First, the old toilet (pictured above) had to come out.  Turn off the water, flush, pour a bucket of hot water through to empty the bowl, and remove.  You'd think that wasn't going to be a very difficult task, but you'd be wrong.  Two flange bolts hold the toilet to the floor, and the problem with older toilets is that the nuts on those bolts are typically rusted solidly in place.  Worse, the flange bolts heads simply fit into a slot on the flange beneath the toilet, so there's very little leverage to be had: the entire bolts will just spin in place.  Enter the list of tools and materials leading off this post...

I tried penetrating oil, WD40, and even brake cleaner (which consists mostly of very light, very volatile hydrocarbon solvents), and though I did thus manage to dislodge quite a bit of rust, that was it.  I had the most success gripping the tops of the bolts with some really big channel-lock pilers and using a box-end wrench to twist the nut in the opposite direction--though this really crushed the threads on the ends of the bolts.  Unfortunately, one bolt was so rusted that the end simply snapped off when torqued--and of course it wasn't the end between the toilet and the floor that broke.

Next came a chisel; I figured if the bolts were that fragile, I might be able to snap them off beneath the nuts.  This meant some rather awkward hammering, as I didn't want to slip and shatter the toilet itself into a million tiny fragments of porcelain.  That didn't get me very far, and next up was a hacksaw.  The problem there was that my toilet was crammed back into a nook, giving me all of a couple of inches of space and a completely useless angle to use the saw.  I gave up on the saw, but perseverance paid off in the end when I managed to get a pair of bolt cutters onto one of the two.  This gave me enough leverage to twist the entire toilet free without further work on the second bolt, as I was able to rotate the toilet around the flange enough that the bolt head aligned with the slot used to originally install it (sort of like the wide part of an old-fashioned keyhole).


A wax gasket serves to seal the bottom of the toilet to the floor flange and sewer pipe, preventing leaks.  The old gasket has to go so that the new one will seal properly.  I discovered in removing the sticky, gunky old mess that whoever had installed the current toilet hadn't taken out the original gasket--there were two, nested sets of rubber seals and wax gaskets!  (You can see one of those in the photo to the left.)  A putty knife, several pairs of gloves, and some rags took care of that phase of prep, all the while with a rag stuffed into the pipe to prevent icky sewer gas from filling the room while I worked.


Notice, too, that the old toilet tank had leaned right against the wall and collected a nice bit of moisture, as well as some mildew where the original wallboard had apparently never been painted at all.  Taking care of that required a scrub brush, some bleach, and a couple of hours of drying time followed by several coats of paint--thankfully, we still had part of a gallon of the "Miami Mist" color on hand.

Everything finally prepped meant it was time at last to install the new toilet.  New flange bolts into the flange: check.  New rubber seal and wax gasket: check.  Remove the rag in the sewer pipe: check.  With Beth's help, I got the new toilet in place, gave it a little twist (to seat the wax gasket properly), and secured it to the floor.  Note that I absolutely slathered the new flange bolts with WD-40, as I expect I'll need to move the toilet at least once when I get around to a total bathroom remodel in a couple of years and retile the floor and walls.  Hook up the water, fill, and flush: nice.  No leaks.


The dual-flush on the new toilet uses only 1 gallon of water for the "light" flush (and though it may be a bit grotesque of me to say so, I do typically follow the Southern California dicta of letting yellow mellow to save water, too) and 1.6 for the "heavy" flush.  While some high-efficiency models are prone to clogs and otherwise problematic, this one seems to work like a charm so far.  (We'll see if the dual-flush mechanism on top of the tank confuses anyone the next time we have guests over...)

The old toilet, thoroughly cleaned, ended up on the cub for Habitat for Humanity to pick up, bound for a new home no doubt.  A little disappointing, I must say, not to take drag it out into the woods for a consultation with a shotgun, but, like the new toilet upgrade, a more environmentally-friendly choice.

Saturday, April 3, 2010

Planting, Framing, Painting, Framing (A Different Kind), Wiring, Writing (Or: Where Has My Weekend Gone?)

It's been a busy weekend for me at Chateau Papillon (and busy for Beth, period; she's putting in 12-hour-plus days petsitting due to spring break for Fairfax County).  First, the plantings, with all this fantastic weather: two River Birches to join the one we planted in our side yard last year; add to that two Red-twig Dogwood shrubs, a juniper (non-native, unfortunately, but c'est la vie), and three bags of various bulbs.  Oh, and I replanted a tree sapling which had seeded itself along the fence line.  Still to go: the Ninebark, two Blueberry bushes, three Rhodies, two foamflowers, and two Inkberries.  And about 6 sacks of miscellaneous bulbs.  And the little saplings from the Arbor Day Foundation (10x) whenever they come in.


The framing?  I needed mats cut for two 12 x 18" prints, so I picked up a Logan 450 Mat Cutter at AC Moore with a 50% off coupon (making it cheaper than Amazon by about $40, but it can be found more cheaply online than that).  I framed the two photos (one of Fort De Soto Beach at sunset, one of a park in Vicenza, Italy), then moved on to more complicated matting and framed a creepy kitty postcard from Venice (said feline is dressed as a plague "doctor"), doing the 4 x 5.75" postcard in a huge 12 x 16" frame with a black mat.


Painting... well, not as much as I might have wanted so far, but I got out the power paint stirrer for my drill and cracked open a can of the chocolate we used in our hallway... two coats later, and the new thermostat looks like it was always meant to be there--despite all the screw holes I filled and sanded down where the new unit hangs vertically.  Add some general touch-up in the hall as well... I'll say the paint, over a year old now, is on its last legs; within 10 minutes after mixing, it had already begin to separate back out.  That leaves the library wall near the lights witch, as well as the library closet (which is still fuchsia, believe it or not).  And touch-up here and there throughout the rest of the house.  Not to mention the Neptune Suite and painting the exterior block walls, but those latter tasks will have to wait.

Framing again... I'm slowly working on framing in the new wall and doorway which will separate the laundry & storage room from the rest of the basement--once complete, guests staying in the Neptune suite need no longer see our Zombie Preparedness Racks of food bought in bulk and the like, or our grubby laundry sink and the sundry junk (X-mas decorations?) piled around that room.

Wiring... goes with that latter framing.  Two new outlets (one GFCI), a new light fixture, two light switches, and rewiring two fixtures we put in a few weeks ago to get them all on the same breaker.  Still to come: crawling in the attic again before it gets ungodly hot and draws in all the buzzy-bees and creepy-crawlies who have come to life with the coming of Spring.  I've got a ceiling fan and the Library's second fixture to install before weather compromises my ability to work in the attic.

Writing... well, I keep having inspiration to go and put some pen to paper and tackle something really creative--maybe the Torso Man story, or maybe something a little less gruesome.  Instead, I'm pooped and am writing in my blog.

I've left out photos, something quite important, as the Bird Watchers' Digest contributor submissions are due Monday, so I've got tomorrow to get my set together and posted online for BWD with the hopes of having them take (and pay me for) one of this month's.  And I've got to check into the due dates for Virginia Wildlife's contest, and Wild Bird's (which I won last year with my White Ibis--can't enter the amateur category there anymore; sigh).  Not to mention more trip photos to process, bird photos taken around the yard (no time yet for a trip to our favorite birding park, Huntley Meadows; sigh).

And cooking... oh, yes, how can I forget that?  I think I'll have to devote another blog to that alone.

It's been a busy start to the weekend, anyway.

Sunday, January 4, 2009

Progress on the Library

One thing we really looked forward to during our entire house hunt and particularly after we found (and then bought) Chateau Papillon was building a library.  I've got nearly 2,000 books (a collection which grows daily at times, it seems), and ever since moving to northern Virginia, most have had to live in cardboard boxes.  Beth has several hundred more herself; I haven't inventoried hers yet, though.

In Blacksburg, I built a set of custom bookcases for my loft, sized for the loft's rear knee wall (just over six feet high--the roof slanted down across it) and for my books (with special shelves 12" deep, and several at perfect heights for paperbacks and others for hardcovers, and yet others for various oversized books).  Even with those, plus my two large bookcases and seven (yes, seven!) smaller 4' tall shelf units, I was even then starting to see book "crowding."

So for Chateau Papillon, we planned to build floor-to-ceiling shelving, making a true library for all those books.  Before moving in, we got the painting done in the library--a nice teal color--though I did leave the ceiling still lavender (I tired of ceiling painting pretty quickly after my home office), with plans to put up tin ceiling tiles instead.  But that's where the library has been for weeks now.

John nailing down bamboo flooring planks
Finally, today I got to work on reflooring the library.  Like the master bedroom and my home office, there had been a lot of damage to the original hardwood floors: paint spills by a former owner or tenant, and many staple and nail holes from the carpet which had been there under the prior owner's tenure.  No problem; we'd ordered enough bamboo to cover all three of those rooms.  I just hadn't had time yet to tackle the library.


The floors are (almost) done now; I've only a few specially-cut strips along the entry side of the room to install.  See those stacks of boxes in the background?  Those are our books, aside from a couple of cartons at the very top.  Between these boxes and a few of cookbooks in the basement, all told there are just under 40 cartons of books awaiting their shelves!

I've got Friday off next week, so I plan to get to work on doing the first two walls' worth of shelves (along the entry wall, where I stood to take this photo; and along the right-hand wall to the window, below it, and then up the other side).  More to come... it will be nice to get those books unpacked!